The membrane is installed on the blinding layer first, after which fresh concrete is poured directly onto its surface. A specially designed reactive bonding layer allows the wet concrete to fully integrate with the membrane during curing. Once hardened, the membrane and concrete form a continuous, permanent composite structure.
Send Inquiry

Description

Technical Parameters

Bonds Directly with Fresh Concrete for Permanent Waterproofing
 

Unlike conventional waterproofing membranes installed on hardened concrete, this pre-applied waterproof membrane is placed before concrete pouring.

The membrane is installed on the blinding layer first, after which fresh concrete is poured directly onto its surface. A specially designed reactive bonding layer allows the wet concrete to fully integrate with the membrane during curing. Once hardened, the membrane and concrete form a continuous, permanent composite structure.

This eliminates any potential water channel between the membrane and concrete, ensuring long-term waterproof integrity.

This product is a pure polymer-based system with no bitumen content and is widely used in subway tunnels, underground galleries, and foundation structures.

product-800-800

How This Pre-Applied Waterproof Membrane Improves Efficiency and Safety

 

This system does not require a protective screed layer. After installation, reinforcement steel can be placed directly on the membrane, and construction personnel can walk on the surface during installation.

The material offers high puncture resistance against rebar, dropped tools, and site traffic. Minor surface damage can self-seal due to its recovery properties.

The system is cold-applied and does not require open flame installation, making it highly suitable for underground construction environments. It eliminates gas torches, odors, and fire risks.

This installation method significantly improves construction efficiency by eliminating one full protective layer, reducing both labor and overall project cost.

Factory Capability and Service Commitment

 

This pre-applied waterproof membrane is manufactured in our 16,000㎡ production facility. We are ISO9001 certified and follow strict quality control procedures.

Please refer to the technical data below for key performance specifications:

The membrane maintains flexibility at temperatures as low as -25°C, with tensile strength exceeding 400 N/50mm and elongation above 50%.

We provide a 1-year warranty and support OEM customization. Free samples are available for evaluation.

The minimum order quantity is 100 square meters per specification.

Standard production lead time is 7 days, while customized orders require approximately 15 days. Production progress photos can be provided upon request.

We are a specialized and innovation-driven manufacturer.

Technical Parameters

Parameter

Value

Product Code

JRJH-PY-004

Sheet Material

HDPE / TPO

System Structure

Polymer sheet + self-adhesive layer + protective coating

Thickness

1.2mm / 1.5mm / 2.0mm

Width

2 meters

Roll Length

20 meters

Low Temperature Flexibility

-25°C

Tensile Strength

≥400 N/50mm

Elongation

≥50%

Impact Resistance

0.5 kg·m, no leakage

MOQ

100 m² per specification

 